Providing access to the road infrastructure
-
The documents needed:
- Application with information about the planned connection point
The resulting documents:
- A letter from the road owner about the possibility of joining to the road
-
The documents needed:
- For federal highways: application; scheme of the planned junctions on the land lots of the roadside strip and the roadside strip of the highway.
- For regional, inter-municipal and local roads — the list of documents is determined by regulatory legal acts of the constituent entities of the Russian Federation or local government bodies approved in accordance with paragraphs 2 and 3 of part 5.3 of Article 20 of Law No. 257-FL.
The resulting documents:
- A written consent containing technical requirements and conditions, or a reasoned refusal to grant consent
-
The documents needed:
- The application
- Draft task for the development of the territory planning documentation in 2 copies
- Draft task for engineering surveys in 2 copies or an explanatory note containing a justification for the absence of such a need
The resulting documents:
- A decision on preparation of the territory planning documentation, which contains a task for the development of such documentation, or a refusal to make a decision with the reasons for the refusal
-
The documents needed:
- The cover letter
- The territory planning documentation — a document containing information to be included in Rosreestr, including a description of the location of the land lot boundaries
- The results of engineering surveys required for the preparation of land planning documentation
- Notification of the results of coordination with the coordinating bodies and road owners
The resulting documents:
- A decision on approving the territory planning documentation, or a decision on rejecting the documentation and sending it for further development
-
The documents needed:
- For a public easement: application; information about the boundaries of the public easement in electronic form, including a graphical description and coordinates of the characteristic points
- For an ordinary easement: application; plan of the easement's boundaries on the cadastral plan of the territory; report on the assessment of the easement fee, conducted in accordance with Federal Law No. 135-FL dated July 29, 1998
The resulting documents:
- For a public easement: a decision on refusal or permission to establish a public easement
- For an ordinary easement: a decision on refusal or a notification of the possibility of concluding the agreement on establishing an easement within the proposed boundaries
-
The documents needed:
- The project documentation
- Work design documents
- Expression of requirements
- The results of the engineering surveys
- Information mentioned in the urban development plan
- Decision on preparation of the documents
The resulting documents:
- The approved project documentation
-
The documents needed:
- The application
- The documents for the land lot
- Details of the territory planning project and the territory landscaping project (if required)
- The results of engineering surveys and project documentation materials: explanatory note, project of the allotment area, sections with architectural and design solutions, project of the construction organization
- Positive conclusion of the expert on the project documentation
- A copy of the accreditation certificate
The resulting documents:
- A building license issuing or a rejection
-
The documents needed:
- The application
- The documents for the land lot
- A building license
- Conclusion of the State construction supervision authority
- Technical plan of a capital construction project prepared in accordance with Federal Law No. 218-FL of July 13, 2015, “On State Registration of Real Estate”
The resulting documents:
- Permission for the object commissioning or a refusal in which the reasons are mentioned
Investor's algorithm for implementing investment projects to ensure access to road infrastructure
(updated on 21.07.2025)